CLIENT | CONSTRUCTION AREA (sf.) | CONSTRUCTION PERIOD | |
---|---|---|---|
ACRYLIC IDEA FACTORY | 33,647.48 | 5 months | |
MASTER LOCK | 24,768 | 3 months | |
ANCHOR TOOL PLASTICS | 27,424 | 3 months | |
TECTROL INDUSTRIES | 36,983.50 | 5 months | |
AMPHENOL OPTIMIZE PLANT 4 | 24,714.96 | 3 months | |
RYOBI OUTDOOR PRODUCTS 1 (MTD) | 102,246 | 3 months | |
RYOBI OUTDOOR PRODUCTS 1 (MTD) | 30,980 | 5 months | |
OTIS ELEVATOR | 73,658.89 | 5 months | |
MAGDALENA INDUSTRIAL PARK | 42,085 | 3 months | |
EL RAQUET INDUSTRIAL PARK | 21,000 | 4 months | |
HYSON | 35,228.27 | 6 months | |
JELD WEN | 77,000 | 5 months | |
STANDEX DE MEXICO | 127,000 | 4 months | |
DAHER SOCATA | 64,000 | 5 months | |
OTIS ELEVATOR PLANT 3 | 51,300 | 5 months | |
TOM RECICLADORES | 30,000 | 3 months | |
B/E AEROSPACE BUILDING 1 | 64,000 | 5 months | |
B/E AEROSPACE BUILDING 2 | 40,090.10 | 4 months |